View Single Post
  #41  
Old Posted Feb 12, 2010, 7:05 PM
wrab's Avatar
wrab wrab is offline
Deerhoof Evangelist
 
Join Date: May 2005
Location: Chicago
Posts: 3,670
TITLE 14 - AERONAUTICS AND SPACE
CHAPTER I - FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
SUBCHAPTER E - AIRSPACE
PART 77 - OBJECTS AFFECTING NAVIGABLE AIRSPACE
subpart b - NOTICE OF CONSTRUCTION OR ALTERATION
77.17 - Form and time of notice.
(c) A proposed structure or an alteration to an existing structure that exceeds 2,000 feet in height above the ground will be presumed to be a hazard to air navigation and to result in an inefficient utilization of airspace and the applicant has the burden of overcoming that presumption. Each notice submitted under the pertinent provisions of this part 77 proposing a structure in excess of 2,000 feet above ground, or an alteration that will make an existing structure exceed that height, must contain a detailed showing, directed to meeting this burden. Only in exceptional cases, where the FAA concludes that a clear and compelling showing has been made that it would not result in an inefficient utilization of the airspace and would not result in a hazard to air navigation, will a determination of no hazard be issued.
http://cfr.vlex.com/vid/77-17-form-a...otice-19562030
-----

TITLE 47 - TELECOMMUNICATION
CHAPTER I - FEDERAL COMMUNICATIONS COMMISSION
SUBCHAPTER A - GENERAL
PART 1 - PRACTICE AND PROCEDURE
subpart a - GENERAL RULES OF PRACTICE AND PROCEDURE
1.61 - Procedures for handling applications requiring special aeronautical study.
Note: By Commission Order (FCC 65455), 30 FR 7419, June 5, 1965, the Commission issued the following policy statement concerning the height of radio and television antenna towers: We have concluded that this objective can best be achieved by adopting the following policy: Applications for antenna towers higher than 2,000 feet above ground will be presumed to be inconsistent with the public interest, and the applicant will have a burden of overcoming that strong presumption. The applicant must accompany its application with a detailed showing directed to meeting this burden. Only in the exceptional case, where the Commission concludes that a clear and compelling showing has been made that there are public interest reasons requiring a tower higher than 2,000 feet above ground, and after the parties have complied with applicable FAA procedures, and full Commission coordination with FAA on the question of menace to air navigation, will a grant be made. Applicants and parties in interest will, of course, be afforded their statutory hearing rights.
http://cfr.vlex.com/vid/77-17-form-a...otice-19562030

Last edited by wrab; Feb 12, 2010 at 7:20 PM.
Reply With Quote