View Single Post
  #44  
Old Posted Jun 11, 2007, 12:40 AM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
May 17, 2007
City Centre Office Tower to Start Soon
Preparation for the demolition of the existing buildings on the site of a new office tower in downtown Red Deer should be finished by the end of the month. The actual demolition will commence soon after followed by the two year construction of the 12-storey, $28 million, 110,000 sq. ft. building. There will also be underground parking for 105 spaces. Executive Place will feature a pair of rooftop decks at the second and sixth floors and a terrace near the top. A bank is interested in the ground floor.

http://www.reddeerregion.com/news.htm

Wow there's apparently lots going on in Red Deer!
Reply With Quote