Posted Jul 28, 2019, 5:15 PM
|
cle/west village/shaolin
|
|
Join Date: Jul 2006
Posts: 11,681
|
|
except they needed to do that because they replaced the wiring the same way as it had been.
thats not what they are doing here.
they are hanging the wiring.
so that bench wall is not needed.
it won't crumble, because they will remove any crumbley sections now (perhaps up to 40% of it or so i have read), but, well, have you ever owned an old car? even if more does crumble in the future, you just remove it or re-bondo it.
you seemed worried that its holding the tunnel together or something. its not. its not integral to anything now.
|