View Single Post
  #3  
Old Posted May 20, 2017, 2:26 AM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,064
Some info was added to the site plan:

Quote:
On May 4, 2017 a rezoning application was filed under
City Case No. C14-2017-0062 to rezone the Property from CS to CBD. Development intensity
for the Project will be achieved using either the existing City of Austin Development Bonus
Program, or rezoning the Property to Central Business District ("CBD"). The Project shall not
exceed a maximum building coverage of 100%, a maximum impervious coverage of 100%, and
a maximum building height of 45-stories. The nature of the permit sought at this point is the
development plan and includes all permits required to commence/complete work on the Project.
This drawing was also added. The site data table on the right states "MAXIMUM BUILDING HEIGHT 45 STORIES".

https://abc.austintexas.gov/web/perm...other-database
__________________
Follow The ATX on X:
https://twitter.com/TheATX1

Things will be great when you're downtown.
Reply With Quote