Quote:
Originally Posted by MonctonRad
Welcome to the forums!
No new news on the construction front, but this really isn’t worrisome. The piling were driven to assess bedrock depth and stability. This information will be used to determine building height, but, all indications seem to be that the developer intends on a 30 storey building.
I hope for excavators on site by this summer.
|
Thanks for the warm welcome ! I was just curious on why the site remained empty and calm for a month, so yeah hopefully we’ll see excavators on site soon ! I just can’t wait for this major change in Moncton’s skyline !
Post-Scriptum I sent you a PM with some additional questions, please check it out if you have the time to do so