View Single Post
  #86  
Old Posted Oct 31, 2015, 10:27 AM
bryantm3 bryantm3 is offline
Registered User
 
Join Date: Feb 2012
Posts: 727
Quote:
Originally Posted by ATLdev View Post
My grand idea is to get rid of the 75/85 connector to alleviate traffic. Run 75 and 85 along the outside of the city, 75 on the west, and 85 on the East. Use the newly found land to connect midtown, downtown, ga tech area, and Atlantic Station all together. I know... expensive and impossible...
i wonder if it would be possible reconfigure 85 and 75 on the northside as sort of a u-shaped highway that comes as far down as atlantic station and turns back north, leaving everything south of there open to redevelopment. this of course would have to be paired with transit.
Reply With Quote