View Single Post
  #12  
Old Posted Apr 19, 2014, 2:22 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,696
Rockaway Boardwalk Reconstruction Project







Quote:
Rockaway Beach Overview

After Hurricane Sandy, more than $140 million was invested to repair and restore Rockaway Beach. As part of this work, led by the NYC Department of Parks & Recreation and the NYC Department of Design and Construction, intact sections of boardwalk were repaired, damaged beach buildings were renovated with new boardwalk islands constructed around them, public restrooms and lifeguard stations were installed to replace destroyed facilities, and interim shoreline protection and anti-erosion measures were created. Thanks to this work, more than three million people visited Rockaway Beach last summer.

The next phase of work to restore Rockaway Beach is to design and build more resilient boardwalks, dunes, and other protective structures and create an integrated conceptual plan for restoring, relocating, or enhancing recreational facilities, concession opportunities, and pedestrian/bicycle access.
====================================
March 31, 2014
http://www.nycedc.com/project/rockaw...uction-project
Reply With Quote