View Single Post
  #77  
Old Posted Jun 25, 2012, 4:20 PM
J_Murphy's Avatar
J_Murphy J_Murphy is offline
Registered User
 
Join Date: Mar 2012
Location: St. John's, NL
Posts: 1,295
Quote:
Originally Posted by statbass View Post
^^^ Thanks for the progress pics of 351 (as well as Fortis). I'm really looking forward to seeing these buildings in their entirety
No problem. I am down that way often so I will try to get some better pics of Fortis soon. With regards to 351, most of the concrete work looks near complete. I expect to see some steel starting to go up soon. The cool thing with these two projects going on the same time is you really get to see the difference in putting up a precast building vs. pouring the concrete in place with formwork.
Reply With Quote