View Single Post
  #165  
Old Posted Jun 26, 2014, 6:03 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
That is disappointing, but at least they are sticking with the timeline. Art Central will be vacated by the end of July, so I guess it will take those 2 months to empty out the building (glass, ceilings, etc) before structural demolition begins in Oct.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.