Quote:
Originally Posted by StillWill
About 50 km south of Fort Mac is clear cut of trees for the road. That's about it so far. They say 5-7 years for the twinning but it looks like more than that with this pace.
The road to Fort Mac to the Peace River area, i think it was Slave Lake, is basically a dead project. It's been to many years long past since that idea has been brought up and nothing was done.
|
That sucks. You guys in the Wood Buffalo region need another road out of town. Building a cross-province road from Fort Mac to Peace River would do very good for the Province as a whole. Likewise, it'd be good to see a road built from Fort Mac east to SK, then they can build it southward to near Canoe Lake.