http://downtownlinks.info/downtown-l...date-may-2016/
A link to a May 2016 update of downtown links project. A final design of the new alternative route from Broadway/ aviation to I-10. The final design is mainly a new alignment showing a straight roadway from aviation to the new barraza aviation instead of the current curve coming from aviation onto congress. The update also reveals two additional artwork pieces, a grand piano and a harp.