Quote:
Originally Posted by rawocd View Post
Looks like SMART is coming along.

Though, I'm seeing a lot of what looks to be single tracking here. How much of the line will be double tracked vs single tracked, and are they leaving room to upgrade if needed for more frequency later?
They are leaving room to add more double track later. As I understand what's proposed, there will be four passing sidings along phase 1 construction;
(1) Hamilton
(2) Petaluma
(3) Cotati
(4) Santa Rosa
Note: the San Rafael Station will have two tracks, and when the extension is built to Larkspur that will complete the fifth passing siding.
Page 50 of the following pdf shows the passing sidings locations on a map.
http://your.kingcounty.gov/mkcc/agen...additional.pdf

Another concept to realize is that the number of passing sidings required depends upon the number of trains you plan to operate at any instant in time. You will need at least one less passing siding as number of trains operating. Presently, they're planning on having 6 trains operating to maintain 30 minute headways - therefore the need for 5 passing sidings to reach Larkspur - even though they haven't quite found all the funds needed to reach Larkspur. As an example, two trains require one passing siding, three trains require two passing sidings, four trains require three passing sidings, etc. Siding placement and maintaining schedules is important to keep the trains meeting properly so the minimum number of sidings work.