View Single Post
  #63  
Old Posted Jun 29, 2017, 3:03 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,510
Quote:
Originally Posted by zzptichka View Post
Judging by today's NCC board meeting agenda they will be installing railings along the Canal between Dow's Lake and Hog's back.
Wish they widened the path as well. It's super busy and tight during rush hour.
I assume you mean on the eastern edge where the path is only separated from the canal by a small curb. I remember 20 years ago being nervous riding my bike along that stretch, as I am sure that if you even bumped your wheel on the curb, you would be going for a swim. The path along the western edge at least has a strip of grass between the path and the canal.

I agree that widening the path would be nice (maybe even a separate bicycle path), but I am shocked that it has taken this long for a railing.
Reply With Quote