View Single Post
  #12  
Old Posted Dec 22, 2008, 12:53 AM
zivan56 zivan56 is offline
Registered User
 
Join Date: Oct 2005
Location: Vancouver
Posts: 1,207
^^ Cost wasn't an issue in Vancouver. The only reason that the latest metro line is a different technology was because the RFP basically asked for it (no shared equipment with existing system). If it wasn't a requirement, it would have been cheaper. However, the next line (Evergreen), which will start construction in a couple of years, will be Bombardier ALRT....as previous attempts to make it LRT were strongly opposed. Also, it looks likely that 2 more extensions (Millenium line to UBC and Expo line further east) will be Bombardier ALRT. So I would say they make a pretty good system.
Reply With Quote