Originally Posted by delts145 View Post


"The number of rooms, parking spaces and size of the convention center will be pretty much the same as the original plan," said Bradford. The original plan included 300 suites, a 40,000-square-foot ballroom and more than 120,000 combined square feet of meeting and convention space.
.

I was noticing that as well Delts while driving on the I-15 on Monday coming back from Lake Powell that there is alot going on in that area. Still there is just a field where that highrise hotel will go. I was wondering while driving by just when will this project take off.



Quote:
Originally Posted by delts145 View Post
The first leg of construction, the 14-story, 300-suite Embassy Suites Hotel, is scheduled to begin June 1, Hammons said. He expects construction to take 14 to 21 months, with an opening in October 2008..

14-stories? I thought the hotel got down size to only 9-stories. Not as exciting.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote