CALGARY | Mark on 10th | 110M / 361FT | 34 FLOORS
I figured there might as well be thread for this one. Demolition has started at site.
From Raffi Architects http://www.rafiiarchitects.com/projects/1108/01s.jpg http://www.rafiiarchitects.com/projects/1108/02s.jpg http://www.rafiiarchitects.com/projects/1108/05s.jpg http://www.rafiiarchitects.com/projects/1108/06s.jpg http://www.rafiiarchitects.com/projects/1108/03s.jpg http://www.rafiiarchitects.com/projects/1108/04s.jpg http://www.qualex.ca/mark/wordpress/...ies-floors.png Images from http://www.qualex.ca/mark/the-building/ |
A picture of the site under demolition.
Quote:
|
Mark Demo work still ongoing
http://farm9.staticflickr.com/8343/8...591e6e14_c.jpg Mark 1 by Calgary-construction4, on Flickr http://farm9.staticflickr.com/8337/8...6463ee0a_c.jpg Mark 2 by Calgary-construction4, on Flickr |
I really like this one.
|
Mark on 10th, with 6th and tenth to the right, close to the Calgary Tower. Both projects are close in height, and compliment each other quite well, imo.
http://imageshack.us/a/img577/3870/with6thandtenth.jpg Original image from the website 6th and Tenth added by me |
Quote:
Tallbob will,be happy to hear this....apparently there may be more floors added to this building. Stay Tuned. |
Surreal: That's all right!
|
|
Some more recent renderings
Quote:
|
Looks to be 35 floors unless I mis-counted.
|
This is great for the west side of the city. There is a lot of filling in to do between Mark on 10th and Vantage Pointe. Astoria and a few new projects need to come on board and the west side of downtown will come alive again.
|
It could be actually. Since the time of the original posting the architect had said they were adding floors.
Quote:
|
Ground Breaking ceremony today.
Quote:
|
About time!
|
A few more recent renderings
http://farm9.staticflickr.com/8366/8...844845e5d0.jpg Mark Condominium by Calgary Renders, on Flickr http://farm9.staticflickr.com/8098/8...a00865ba76.jpg Mark Condominium by Calgary Renders, on Flickr http://farm9.staticflickr.com/8373/8...d2bd6dfa7c.jpg Mark Condominium by Calgary Renders, on Flickr |
Reposted from the Calgary construction thread.
Quote:
|
Very nice project.
|
With Calla wrapping up, I kinda figured that Qualex would be focusing on moving Mark on Tenth forward. It will be nice to see since there are to many vacant lots in this area.
|
According to the Architect (Rafii Associates) the building is 110M/361feet. and 34 storeys. That sounds about right, but I'm wondering if that's roof height. A 34 floor building with that piece on top would normally have a higher structural height I would think.
Arriva has 34 floors, and a structural height of 420' |
|
Glad to see a pile driver on site :tup:
|
It is on site but it has not done any work as of yet.
http://farm9.staticflickr.com/8248/8...deaa1eb7_c.jpg |
No work yet, but I see that they have at least moved it :). It looks like a few extra construction materials have arrived also.
|
They have started drilling the piling holes. Hopefully the snow won't slow them down!
|
Quote:
|
Still not much action, but more supplies have arrived and the pile driver has moved.
Mark on Tenth: http://farm9.staticflickr.com/8551/8...9ed1e241_c.jpg http://www.flickr.com/photos/8286638...n/photostream/ http://farm9.staticflickr.com/8552/8...fc296a65_c.jpg http://www.flickr.com/photos/8286638...n/photostream/ |
Lights, camera....Action!
Mark looks to be officially on the go now. http://farm9.staticflickr.com/8553/8...fdc5792c_b.jpg Mark Condo Calgary by EvolvingNow, on Flickr |
Action times two. A caisson drill working the North and south side of the property.
http://farm8.staticflickr.com/7289/8...f68e93b4_c.jpg |
Nice to see 2 pile drivers. It won't be long before excavation starts.
|
Qualex-Landmark is going full bore. They now have three caisson drills working onsite. I think they will be digging before First.
http://farm3.staticflickr.com/2876/8...c61e3b32_c.jpg |
I noticed they now have three. They must be anxious tom get this one going!
|
|
Pile drivers are gone and the digging has started. Just as I thought that Mark would get digging before First.
http://farm4.staticflickr.com/3689/9...ae664a71_c.jpg |
Quote:
|
I think they want this building to start to rise to increase sales, before 6th and Tenth and maybe Astoria get going.
|
is this building experiencing problems with the flooding now? are any holes flooded?
|
Quote:
|
Is construction going again?
|
^^^ Yes
A horizontal Auger for putting in the tendon tie backs. http://farm6.staticflickr.com/5454/9...2ebe8f4c_c.jpg |
|
|
|
|
|
|
|
Won't be long before they drop a crane into Mark.
|
|
Lookin good :tup:
|
|
All times are GMT. The time now is 6:31 AM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.