SkyscraperPage Forum

SkyscraperPage Forum (https://skyscraperpage.com/forum/index.php)
-   Manitoba & Saskatchewan (https://skyscraperpage.com/forum/forumdisplay.php?f=129)
-   -   Gardens on Rose | Regina | 13 floors | 45 meters | Completed (https://skyscraperpage.com/forum/showthread.php?t=196860)

Chadillaccc Jan 4, 2012 1:56 PM

Gardens on Rose | Regina | 13 floors | 45 meters | Completed
 
Important projects need their own threads... no one else is doing it so I will :)

HomeInMyShoes Jan 4, 2012 2:30 PM

The Gardens on Rose Website.

Stormer Jan 5, 2012 4:48 PM

I cannot see Graham Construction building this and Centre Square Place exactly in sync. That is, they wil not be excavating at simultaneously. One would assume they will excavate CSP first and then start shoring. The excavators will move 2 blocks down to GoR followed by the shorers once they are done at CSP...and so on. It only makes sense.

Baker58 Jan 24, 2012 3:11 PM

since work is starting (I think), may as well bump this back up.

micheal Jan 24, 2012 4:00 PM

Quote:

Originally Posted by Stormer (Post 5538415)
I cannot see Graham Construction building this and Centre Square Place exactly in sync. That is, they wil not be excavating at simultaneously. One would assume they will excavate CSP first and then start shoring. The excavators will move 2 blocks down to GoR followed by the shorers once they are done at CSP...and so on. It only makes sense.

Do they have to shore the GoR even though they don't have underground parking? i think CSP has 2 floors of underground parking.

Baker58 Jan 24, 2012 9:16 PM

about half of the parking lot has been ripped up. Nice to actually see work going on.

thefourthtower Jan 25, 2012 2:50 AM

`

thefourthtower Jan 25, 2012 6:08 PM

`

Nathan Jan 25, 2012 7:51 PM

Quote:

Originally Posted by thefourthtower (Post 5563601)
Tuesday, January 24, 2012 3:41:45 PM
The Condo Building And The Untouchable Couch
by James Brotheridge

People keeping an eye on housing in Regina, like any of the many who showed up to last night’s city council meeting, might be interested to know: the Guns N’ Roses Condo Complex is on its way! (GnR because the Gardens on Rose, the building’s official name, share a logo with the hard-rocking band behind “Welcome to the Jungle”, minus the pistols.) Of course, this doesn’t have a whole lot to do with “affordable” housing; the cheapest suite they have listed at their website is going for $441,000. Still, it’s better than the semi-empty parking lot that was there before.

I say “semi-empty” because you’d still see people parking there on occasion in addition to one regular resident: the couch in the middle of that picture. It has been there for months. Someone ditched it and no one has had the ambition or desire to move it since. Here’s a picture of the couch in warmer times.

Almost all the stuff that made this a parking lot has been cleared off the lot, but the couch remains. I really don’t think it’s going anywhere. As the building goes up, they’re just going to have to build around it. It’ll be an architectural feature of the building.

The ground breaking ceremony happened back in November, but yesterday was the real day stuff got started.

Take a look after the jump for another angle of the scene
soure the prairie dog , they have a picture digging up the site

It's great that you mention it's in the prairie dog, but can you post a link with your articles?

BrannyMuffin Jan 25, 2012 10:27 PM

Quote:

Originally Posted by thefourthtower (Post 5563601)
Tuesday, January 24, 2012 3:41:45 PM
The Condo Building And The Untouchable Couch
by James Brotheridge

People keeping an eye on housing in Regina, like any of the many who showed up to last night’s city council meeting, might be interested to know: the Guns N’ Roses Condo Complex is on its way! (GnR because the Gardens on Rose, the building’s official name, share a logo with the hard-rocking band behind “Welcome to the Jungle”, minus the pistols.) Of course, this doesn’t have a whole lot to do with “affordable” housing; the cheapest suite they have listed at their website is going for $441,000. Still, it’s better than the semi-empty parking lot that was there before.

I say “semi-empty” because you’d still see people parking there on occasion in addition to one regular resident: the couch in the middle of that picture. It has been there for months. Someone ditched it and no one has had the ambition or desire to move it since. Here’s a picture of the couch in warmer times.

Almost all the stuff that made this a parking lot has been cleared off the lot, but the couch remains. I really don’t think it’s going anywhere. As the building goes up, they’re just going to have to build around it. It’ll be an architectural feature of the building.

The ground breaking ceremony happened back in November, but yesterday was the real day stuff got started.

Take a look after the jump for another angle of the scene
soure the prairie dog , they have a picture digging up the site

http://www.prairiedogmag.com/?p=36754#more-36754

blacktrojan3921 Feb 4, 2012 1:40 AM

http://i200.photobucket.com/albums/a...tomanno006.jpg

http://i200.photobucket.com/albums/a...tomanno007.jpg

Well.... At least it's progress?

DowntownRiderFan Feb 6, 2012 6:48 PM

There is an excavator back on-site today moving dirt around

Stormer Feb 21, 2012 12:13 AM

Track hoe still there but no hole yet.

http://i199.photobucket.com/albums/a...0220-00174.jpg

Baker58 Feb 21, 2012 12:18 AM

Quote:

Originally Posted by Stormer (Post 5598488)
Track hoe still there but no hole yet.

http://i199.photobucket.com/albums/a...0220-00174.jpg

Last week there was a hole but it looks like all they did was rip out a bunch of rocks and backfill it all. I am almost wondering if there is going to be no excavation with this one and they were just clearing any debris on the site before they started hammering in piles.

Nathan Feb 21, 2012 12:53 AM

Quote:

Originally Posted by Baker58 (Post 5598498)
Last week there was a hole but it looks like all they did was rip out a bunch of rocks and backfill it all. I am almost wondering if there is going to be no excavation with this one and they were just clearing any debris on the site before they started hammering in piles.

Well, the parking is supposed to be the first 4 floors above ground right? So that could make sense I guess.

Chadillaccc Feb 21, 2012 3:51 AM

No underground parking? wtf?

djforsberg Feb 21, 2012 4:22 PM

Quote:

Originally Posted by Chadillaccc (Post 5598808)
No underground parking? wtf?

This has been planned for a few years already.

thefourthtower Mar 17, 2012 7:16 PM

`

Goose Mar 17, 2012 9:23 PM

Construction crews have blocked off 1 block of Rose Street and put up concrete barriers.

http://farm8.staticflickr.com/7048/6...9a57cd5769.jpg

http://farm8.staticflickr.com/7045/6...0d972f9467.jpg

This sign, with an estimated completion date, was put up a few weeks ago.

http://farm8.staticflickr.com/7057/6...ed68b53774.jpg

DowntownRiderFan Mar 22, 2012 4:34 AM

There is now pile driving equipment on site.

Sorry, no photos


All times are GMT. The time now is 7:01 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.