Jets4Life Sep 17, 2007 9:49 PM

Anthony Henday Drive
 
Does anyone have any pics of this great highway? Is the SE section almost ready for traffic. I cannot wait to drive down that wonderful stretch of highway!:yes:

Coldrsx Sep 17, 2007 9:56 PM

^SE opens in october i believe...SW is open, but the SE was P3 which means fully done including all free flow.

more info:

http://www.accessroadsedmonton.ca/ahd.shtml

Coldrsx Sep 17, 2007 9:57 PM

Construction Schedules/Milestones
April 2005 Construction begins
Fall 2006 Structures from Gateway Boulevard to 66th Street completed
Fall 2006 Mainline paving from Gateway Boulevard to 34th Street completed
Fall 2007 Structures from 50th Street to Highway14/216 Interchange completed
October 2007 Balance of mainline paving and Interchange paving completed
October 2007 Anthony Henday Drive S.E. opens
October 2007 Operations and maintenance begins

SpongeG Sep 18, 2007 12:00 AM

how does it run? from where to where?

mersar Sep 18, 2007 12:22 AM

Route map

From Calgary Trail east to Highway 14, then north to about half way from #14 to the Whitemud.

feepa Sep 18, 2007 2:39 PM

the SE portion of this ring road is what they are referring to...
http://img176.imageshack.us/img176/2866/ahdmapzx8.jpg

The SW, W and E sections are already complete - the SE will complete this fall. all thats left is the north section (anything north of yellowhead basically on this ring)

Coldrsx Sep 18, 2007 3:02 PM

now get on the NE/NW and those stupid interchanges for the SW

Kevin_foster Sep 18, 2007 3:28 PM

I live in St. Albert, but I have not seen whether or not they have completed the regional bypass road - anyone know if they are finished this? Maybe I should drive by tonight... great if you want to go North and bypass both EDM and St. Albert :)

feepa Sep 18, 2007 4:15 PM

The full west regional road is far from completed. I think you can only still make it to 137 ave...then have to go to 184st...

The rest should be ready to go soon though, to the first intersection north of big lake

brento79 Sep 18, 2007 4:52 PM

I heard that the se leg opens on the 23rd of September, or was that just a small portion of it?

JAH Sep 18, 2007 7:23 PM

I can't wait till AHD SE opens.. hopefully it helps a little with 23rd ave traffic. Just driving around the SE now.. like on 91st, Parsons road, 66 St, it just feels like a whole new area with the freeway and interchanges.

Just curious.. does anyone know what work is being done on AHD right by the Windermere development? It looks like some kind of interchange or something

Coldrsx Sep 18, 2007 7:48 PM

^yup...another one...156st if i recall...or was it 142st

JAH Sep 18, 2007 7:53 PM

^ Really?? When do they plan on doing that? Wouldn't it be more wise to use that money to upgrade the 2 existing intersections that need interchanges in the west end instead?

Spencer Sep 18, 2007 10:13 PM

Quote:

Originally Posted by Kevin_foster (Post 3060700)
I live in St. Albert, but I have not seen whether or not they have completed the regional bypass road - anyone know if they are finished this? Maybe I should drive by tonight... great if you want to go North and bypass both EDM and St. Albert :)


The West Bypass I read in the Gazette is supposed to open to Meadowview drive later in September. It will then open to Giroux road sometime in mid October. I heard the late opening was due to CN taking along time to complete the train crossing portions. I can't wait, the Giroux portion will help me out as I live in Erin Ridge.:banana:

CMD UW Sep 18, 2007 11:19 PM

Quote:

Originally Posted by JAH (Post 3061189)
^ Really?? When do they plan on doing that? Wouldn't it be more wise to use that money to upgrade the 2 existing intersections that need interchanges in the west end instead?

No, 156 / Rabbit Hill Road interchange will be needed soon.

IKAN104 Sep 19, 2007 2:55 AM

I heard today that the West Bypass road is now a provincial responsibility and it will take over the Highway 2 designation from St.Albert Trail.

IKAN104 Sep 19, 2007 2:58 AM

I was at the North Anthony Henday open house today and they showed all the plans from Yellowhead to Yellowhead, including the changes around the seminary college. All in all pretty impressive.

Construction is to begin in the summer of 2008 with completion scheduled for November of 2011.

feepa Sep 19, 2007 3:10 AM

^^ links to open house pdfs

http://www.infratrans.gov.ab.ca/INFT...ion/nerrgp.htm

liferanger Sep 23, 2007 4:35 AM

Nice to see that 90% of the Henday will be complete....I dont understand why Mandel is bitching.....we will have over 90% complete while Calgary has a glorified Yellowhead tr for apx 50%...

brento79 Sep 23, 2007 4:16 PM

He's bitching because the money for the future isn't divided the right way for our city. I come back and say to you that Calgary could have a road like ours but they spent there money of LRT instead. Now that is our next major project while theres is now the ring road.