Glad to see a pile driver on site :tup:
|
It is on site but it has not done any work as of yet.
http://farm9.staticflickr.com/8248/8...deaa1eb7_c.jpg |
No work yet, but I see that they have at least moved it :). It looks like a few extra construction materials have arrived also.
|
They have started drilling the piling holes. Hopefully the snow won't slow them down!
|
Quote:
|
Still not much action, but more supplies have arrived and the pile driver has moved.
Mark on Tenth: http://farm9.staticflickr.com/8551/8...9ed1e241_c.jpg http://www.flickr.com/photos/8286638...n/photostream/ http://farm9.staticflickr.com/8552/8...fc296a65_c.jpg http://www.flickr.com/photos/8286638...n/photostream/ |
Lights, camera....Action!
Mark looks to be officially on the go now. http://farm9.staticflickr.com/8553/8...fdc5792c_b.jpg Mark Condo Calgary by EvolvingNow, on Flickr |
Action times two. A caisson drill working the North and south side of the property.
http://farm8.staticflickr.com/7289/8...f68e93b4_c.jpg |
Nice to see 2 pile drivers. It won't be long before excavation starts.
|
Qualex-Landmark is going full bore. They now have three caisson drills working onsite. I think they will be digging before First.
http://farm3.staticflickr.com/2876/8...c61e3b32_c.jpg |
I noticed they now have three. They must be anxious tom get this one going!
|
|
Pile drivers are gone and the digging has started. Just as I thought that Mark would get digging before First.
http://farm4.staticflickr.com/3689/9...ae664a71_c.jpg |
Quote:
|
I think they want this building to start to rise to increase sales, before 6th and Tenth and maybe Astoria get going.
|
is this building experiencing problems with the flooding now? are any holes flooded?
|
Quote:
|
Is construction going again?
|
^^^ Yes
A horizontal Auger for putting in the tendon tie backs. http://farm6.staticflickr.com/5454/9...2ebe8f4c_c.jpg |
|
All times are GMT. The time now is 3:00 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.