NEW ROCHELLE, NY | RDRXR General Development
This is the general thread for New Rochelle, NY RDRXR development.
Source Article: Talk of the Sound SYNOPSIS: Quote:
|
Article Source: Westfair Online
http://i.imgur.com/nracsw4.jpg?1 HQ version Quote:
|
if they can acquire the site of the downtown library, RXR will build a landmark 48-story tower which I hope will surpass the Westchester Ritz Carlton Condo towers in White Plains.
LoHud: Consultant will layout options for New Rochelle library Quote:
|
Quote:
|
Notes from the Planning Board meeting on June 28th:
393 Huguenot St: - proposal to demolish current structure - construct a 6-story mixed used - 60 residential units, retail, community space - 57 proposed parking spaces; 40 provided through "mechanical carousel", 17 traditional, ground level spaces - floor plans include one bedroom studio (primarily), studio units - fiber-cement panels, brick base - modular construction http://i.imgur.com/FoupCt4.png http://i.imgur.com/5aDKBNM.png http://i.imgur.com/7l3GdTd.png http://i.imgur.com/ayyWOOw.png This project is set to return at next month's planning board meeting. One other note is that this property is less than 500 ft. away from another planned building, from RDRXR (seen a few posts above this one). 43 Church St: - first seen around September 2015 - proposed 8-story boutique hotel (Choice Hotels, originally Best Western) - 80 rooms (formerly 78 rooms, two were reserved for game room / other amenities under Best Western, not necessary with Choice Hotels) - valet parking in Church St. Garage 348 Huguenot St / 587 Main St (UPDATE TO SECOND POST IN TOPIC): - restore theater facade which will match, as close as "we can possibly get" using historical photos and reference, the original 1926 theater marquee - will be used as signage for retail tenants, as well as the black box theater located on 2nd floor - will include outdoor courtyard (located at roof of the 3rd floor), BBQ pits, lounge chairs, etc - indoor resident lounge - fitness center on 2nd floor - 280 units, mix of studio (54 units), 1 bd (125 units), and 2 bd (101 units) units, no 3 bd; avg. apartment size is about 750 sqft. - entrance into parking garage located on Huguenot St - bidding out of project currently in progress - lane will be taken out of operation on Huguenot St during construction, along with sidewalk closure - estimated length of time for construction: 24 month overall schedule, 26 including demolition - final accent lighting design to be brought back to planning board meeting in the future for administrative review |
Construction to Begin in New Rochelle on $120 Million Apartment Building
Project will serve as cornerstone for a 10-year plan to add more housing and businesses downtown https://si.wsj.net/public/resources/...1129160454.jpg A rendering showing commercial space in the tower planned for downtown New Rochelle. PHOTO: RXR REALTY LLC Real-estate development firm RXR Realty is set to begin construction Wednesday in New Rochelle on a $120 million apartment building that will serve as a cornerstone for a 10-year plan to add more housing and businesses downtown. The city’s $4 billion plan will include 12 million square feet for new apartments, commercial-office space and arts and cultural institutions. New Rochelle, part of Westchester County, saw many residents and businesses leave the downtown during the 1970s and 1980s. Developers returned in the late 1990s and early 2000s and built some 1,500 units of housing along with a new entertainment center and a park, said Mayor Noam Bramson. “That initial wave did not achieve the critical mass that ignites a downtown area as a whole,” Mr. Bramson said. “This next effort, which is more ambitious in its scale and procedural components, is intended to achieve that broader transformation.” New Rochelle plans for 6,370 new housing units to be built downtown over the next decade. About 8,700 people live in downtown New Rochelle as of the 2010 Census. The plan will add 1,200 hotel rooms and 2.4 million square feet of commercial office space. New Rochelle’s plan to build up its downtown fits a pattern seen throughout the tri-state area where developers have focused in recent years on building apartment buildings in suburbs and smaller cities close to mass transit that can take people into Midtown Manhattan, said Chris Jones, chief planner for the Regional Plan Association, an urban research and advocacy group. “That kind of came to a halt when the housing bubble hit in 2008,” Mr. Jones said. “They are starting to come back online now.” New Rochelle, with a population of about 79,800, picked RXR and real-estate firm Renaissance Downtowns as lead developers for the initiative. Scott Rechler, chief executive of RXR, said many young professionals and empty nesters can’t afford to live in Manhattan, but still want to live in an walkable urban area close to New York. “They are all looking for this type of downtown lifestyle but perhaps without being in a city like New York City,” Mr. Rechler said. |
Demolition has started on the 587 Main St. project. This is where the tower will stand when completed.
http://i.imgur.com/wijbAdB.jpg http://i.imgur.com/EOIWUGn.jpg http://i.imgur.com/L2CAbjy.jpg |
Former Miami Nightclub building torn down to make room for a 14-story mixed used project.
http://i.imgur.com/eCfjSsu.jpg?1 |
The above photo is connected to this article and rendering. Cappelli's old LeCount Square proposal was incredibly ambitious. I wish they were able to get it off the ground as New Rochelle would have benefited greatly from it.
---------- Westfair Online - "Cappelli Organization back to work in New Rochelle" (link) https://westfaironline.com/wp-conten..._rendering.jpg Rendering of The Cappelli Organization’s planned apartment and retail development in downtown New Rochelle. Quote:
|
Back in January the city issued a RFP for the No 1 Firehouse. A 28 story tower will be built.
New Rochelle seeks proposals for coveted downtown fire station parcel https://westfaironline.com/wp-conten...PM-600x730.png Quote:
|
The RFP had a March 10th deadline, and lohud reported that "about 30 people interested in development attended a voluntary site visit on Jan. 25". The same article mentions that the city is open to de-mapping Cedar Street, which runs behind the station, to allow for more sq. footage - but I think they'd need state approval to do that. Not sure what the status is on the bid, as they haven't mentioned it since they announced it.
The tricky part actually seems to be more of a possible major dilemma. |
Here's a new photo showing the progress they made since starting demolition. I don't think they have much left to do at this point. Not sure when actual construction work will begin, but I'll keep the thread updated.
http://i.imgur.com/J319okU.jpg |
Lots of dump trucks were loaded with debris from the site and went on their way. Site cleanup is definitely getting done. It's only a matter of time before we see proper construction.
|
No. 1 Firehouse Redevelopment - 45 Harrison Street
http://www.news12.com/clip/13429339/...firehouse-plan http://i.imgur.com/7ywkKyC.png http://i.imgur.com/IO8K6jH.jpg http://i.imgur.com/XRfUMhX.png https://patch.com/new-york/newrochel...n-new-rochelle Quote:
|
Milennia (22 Burling Lane) | 6 Floors | Residential
Developers Break Ground On $30M 'Millennia' In New Rochelle http://a1.static.dailyvoice.com/imag...ocument_z6xszg Quote:
Apartments planned on North Avenue near Iona College https://westfaironline.com/wp-conten...th-600x417.jpg "Ten Com" - 10 Commerce Drive | 9 FLOORS | Residential http://www.eastandhudson.com/projects/#prettyPhoto http://i.imgur.com/ZyzWi24.jpg |
Pratt Landing (Echo bay)
Developers Unveil 'Pratt Landing' Vision For New Rochelle Waterfront Quote:
http://a4.static.dailyvoice.com/imag...7.18_PM_fhwbhh http://a5.static.dailyvoice.com/imag...6.53_PM_pjmhlb http://a2.static.dailyvoice.com/imag...7.07_PM_tzqbrz |
High-Resolution renderings of the selected 45 Harrison St. proposal
Variant 1 https://i.imgpile.com/nNfMQ8.png Variant 2 https://i.imgpile.com/nNfPNb.png View from across the current fire station (looking directly at it) https://i.imgpile.com/nNfxbC.png Site plan for new Fire Headquarters https://i.imgpile.com/nNfKlS.png |
|
Concrete was poured late Friday night. The trucks didn't stop coming until Friday afternoon. Now fully under construction!
http://i.imgur.com/JebmYC1.jpg http://i.imgur.com/WiiB1oc.jpg http://i.imgur.com/Jyb1MUl.jpg |
Courtesy of our mayor's blog post;
http://www.noambramson.org/uploads/2...on-672x372.png Wish the image was a bit larger, but at least it gives us a closer look. |