HOUSTON | Phillips 66 HQ | 274 FT & 242 FT | 16 & 14 FLOORS
Groundbreaking was today. 1.1 million sf/16 floors
Construction begins on Phillips 66 new west Houston campus http://blog.chron.com/primeproperty/...adquarters.jpg |
Three cranes up at this point - c/o 'BigFootsSocks' on HAIF
http://www.houstonarchitecture.com/h...1391560284.jpg |
Is that I-10 or the West Belt?
|
|
Now, that's some crane porn.
|
|
Pretty nice suburban campus and parking garage.
|
For some reason I thought there were six in one of the other photos. That and Air Liquide must be quite a sight.
|
5/14 - c/o 'Triton' on HAIF
http://i177.photobucket.com/albums/w...ps2a0ec489.jpg 6/5 - c/o 'cloud713 on HAIF/here http://i1339.photobucket.com/albums/...pscu8setsz.jpg |
|
|
|
Latest news is that Phillips 66 has switched contractors on this project, removing WS Bellows and giving the work to Gilbane, per HBJ.
|
I have no idea why they replaced contractors on this project. 10/31 by cloud713 at HAIF. Note the orientation of the cranes:
http://i1339.photobucket.com/albums/...psbye2eg9z.jpg |
Are you referring the direction the jibs are pointing?
|
Yep - looks shut down, on a Friday.
|
|
Topped out today. Despite the replacement of the lead contractor, this one continues to completion.
Phillips 66 tops out new Houston headquarters (Video) |
|
|
All times are GMT. The time now is 3:27 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.