Built between 1970-1972, but transformed into a Cable-stayed bridge with 70 meter high pylons.
The Bridge expanded with extra lanes, because of the increasing traffic pressure
Do you see any incorrect data on this page? Please let our editors know of any corrections you can make by posting them in the Database Corrections section of the discussion forum (open to the public).